[No. 3 Gold]
[No. 3 Black]
[No. 2 Mahogany Grain]
[No. 3 Yellow Wood Grain]
[No. 5 Gray]
[No. 5 Silver]
[No. 2 Brushed Rose]
[No. 2 Huanghuali]
Installation steps:
1. Prepare an insulating ground wire sleeve of suitable size;
2. Cut it to the required length;
3. Put the wires and cables into the protective wire cover, and arrange the wires;
4. Install
Packing list:
1m floor trunking×1
Function:
It can keep the floor/wall clean and tidy, prevent the wires from tripping the family members, and effectively isolate the danger of the wires.
Kind tips:
Due to different lighting and screen settings, the color of the item may be slightly different from the picture.
Please allow for slight size differences due to manual measurements.