Features
The distance from the center of the hole at the bottom of the Strut Channel Trolley can meet the location requirements of the installation hole of different types of electric hoist.
It can be used in conjunction with the Strut Channel to set up 2 directions of movement so that the Hoist can work in multiple positions.
Bearing welding positioning, to ensure the stability of the work.
Roller Trolley Standard deep groove ball bearing installation. Smoothy, no noise and no lubrication.
Note
The Roller Trolley mounting platform is 0.39 inches thick, and the fixing bolts for installing the electric hoist need to be lengthened.
If fixing screws are installed inside the Strut Channel, the tram will not be able to pass the track, so the bolts securing the Strut Channel need to be installed outside the track.