[3m & 118 inch Clear]
Installation steps and attentions
1. Please completely clean the surface of floor and water retaining strip, and allow to dry.
2. Determine the position of the water retaining strip and mark it with a pen on the ground.
3. Cut the water dam to length with a hacksaw.
4. Peel off the pre-applied adhesive tape and put in place. Heat the gum by hair dryer for better stickiness when its cold.
5. Caulk any edge seals and clean up excess silicone leaving a smooth caulk line.
6. Allow to dry and no contact with water in at least 24 hours.
Results:
1. Due to different displays and lighting effects, the actual color of the item may be slightly different from the color shown in the picture. Thank you!
2. Due to manual measurement, a measurement deviation of 1-3cm is allowed.