Installation method
Perforated installation: 1. Dry the wall to keep it dry
2. Mark the location of the perforation on the wall
3. Use 6mm drill bit to punch holes
4. Punch the expansion tube into the hole
5. Place the shelf horizontally and screwdriver screw good
6. Cover the decorative cap and check
Installation without holes: 1. Dry the wall to keep dry
2. Apply glue to the place where the product needs to be attached to the wall
3. Press the base on the wall to keep a few seconds
4.Paste the auxiliary glue and wait for 72 hours for the glue to solidify